Studies for FAIR

Aim of this project was the evaluation of the costs for the industrial series production of superconducting accelerator magnets for the FAIR project, which should be built at the German research center GSI in Darmstadt.

Considered Magnets:

  • 120 SIS 100 Dipoles: fast ramped (4T/s) Options: Yoke at 4 K or at 80 K
  • 180 SIS 100 Quadrupoles Super FRS Dipoles, warm Yoke, Several Options 24 CR Dipoles, warm yoke
  • 42 NESR/RESR warm yoke Dipoles: ramped (1T/s), eddy current suppression for cryostat.

Customer: GSI Darmstadt

Projektlaufzeit: 2003 - 2004