Planning and delivering the equipment technology and infrastructure
Babcock Noell plans the necessary technical equipment for the dismantling, with or without remote control including manufacturing testing, commissioning and operation with own personnel.
Babcock Noell designs and supplies:
Manipulator girder systems, disassembly appliances and instruments with which the highly activated and contaminated reactor components are dismantled through remote-control. The equipment is manufactured on the basis of the preliminary examination documents.
| |
Under water pad saw for dismantling of core equipment units in the ILL, Grenoble Oval pipe cutting equipment used for the sutting of pipes under water, with the change oft parts in the reaktor am ILL, Grenoble | ![]() |
Example for supplement of infrastructure: Caisson for the second cutting of high contamined components coming up with the dismantling of the NPP Würgassen. | |



Manipulator girder systems, disassembly appliances and instruments with which the highly activated and contaminated reactor components are dismantled through remote-control. The equipment is manufactured on the basis of the preliminary examination documents. 

Example for supplement of infrastructure: Caisson for the second cutting of high contamined components coming up with the dismantling of the NPP Würgassen.